Flat-Pack Container Houses
Confirm what travels as loose frames, panel bundles and floor cassettes. Request a numbered packing list and separate shipping weights.
View the rangeStart with the building type, then set the quantity, destination and interior scope before asking suppliers for prices.
Confirm what travels as loose frames, panel bundles and floor cassettes. Request a numbered packing list and separate shipping weights.
View the range
Compare a volumetric room with a panelized room on site labor and transport as well as unit price.
View the range
Send a room schedule and opening sizes. Ask for the contract boundary at utility terminations.
View the range
Require a member list and connection schedule. Verify coating and touch-up instructions with the selected supplier.
View the rangeThe five checkpoints describe purchasing records. Supplier qualifications and building approvals are reviewed for the destination project.
These scenarios illustrate quotation inputs. Images depict typical uses; none represents a completed engagement.
Compare panel core options for a remote office. Ask the supplier to show bundle protection and ask the local crew to confirm dry storage.
For a classroom on an existing slab, compare door thresholds and floor buildup against the measured step at the walkway.
Set out the frame dimensions and use the drawing revision to track changes in window openings or steel thickness.
A maintenance bay may need a clear span instead of connected modules. Request the door headroom and reactions before comparing frame packages.
A camp, classroom and office can use similar modules while having different fire separation, access and utility requirements. The local project team determines the applicable rules.
Workforce camps
Site offices
Clinics and classrooms
Residential plots
Use this list to identify missing documents before selecting a supplier. Record the drawing or report revision beside every quotation line.
Ask for the supplier model, external size and fit-out schedule.
Record the engineer-issued wind, snow and seismic criteria with the project location.
Request the supplier sequence, tools and site work excluded from its price.
List the evidence the supplier can provide and the approvals that remain with the local project team.
Send a layout, unit count, delivery window and discharge port. Mark pending design information so suppliers can price assumptions separately from confirmed work.
Open the project desk