Design freeze, packing marks and installation sequence stay on one project file.

Project delivery roadmap

Karmod Project Delivery

The purchasing file follows the brief from design freeze through supplier production, packing and installation handoff. Each stage has a document, a reviewer and a reason to hold release.

Request a delivery review
Factory door with wrapped modules staged for loading

Four gates before site handover

Read the gates in order. When a change affects a later record, send the revision to both the supplier and the person accepting the next handoff.

Gate A: Define the brief

Record intended use, destination country, planned storeys and count. Separate firm requirements from items each bidder may propose.

Gate B: Freeze the design inputs

Tie the drawing issue to site wind, snow and seismic criteria. An engineer should label any provisional input and state when it needs replacing.

Gate C: Check the shipment file

Check bundle count, gross weight and protective wrapping against the released bill of materials. Ask the forwarder to verify equipment limits for that route.

Gate D: Review site readiness

Share the foundation and access drawings with the installer. Ask who checks bearing levels, crane position and sealing materials before cargo arrives.

Technical fields that can change a shipment

The figures on these cards illustrate what to record. They are never a specification or a guarantee for a particular supplier.

4-8

Kits per 40HQ

Compare a provisional count of four to eight limited-fit-out kits with the supplier’s dimensioned load plan. Added sanitaryware may fill space before gross weight becomes limiting.

50-100 mm

Wall panel thickness

When comparing panel thickness options, record core, density and declared conductivity. Calculate wall U-value with the installed build-up and account for thermal bridging at rails.

6055 mm

Typical module length

Check the outer plan against usable room width and loading restrictions. A 6055 mm outline does not establish ISO CSC status.

A panelized CFS building may reduce bulky cargo but increase site work. A volumetric room can ship with more finishes installed, provided the lifting and transport plan can handle the resulting weight and size.

For fire performance, request the report for the wall configuration including its joints and penetrations. Compare its installation instructions with the proposed module drawings.

Who reviews which record

Keep a review owner beside each document. Supplier, inspector, forwarder and installer can each release only their assigned work.

Structural calculation desk

Load reviewer

The project engineer reviews the load basis and anchor reactions for the actual site.

Panel core samples on a bench

Panel buyer

The buyer compares the approved sample with the supplier material schedule and agrees what evidence is needed for substitutions.

Container stowage sketch

Stowage clerk

The forwarder checks proposed package sizes and the document description used for dispatch.

Anchor bolts on a slab

Set crew lead

The appointed installer reviews lifting points and confirms the local utility and foundation interface.

Example: if an external stair is bought separately, list the interface dimensions and anchor position on both scopes. A missing stair is a site access constraint even when the room itself ships on time.

Track field cuts to galvanized sections and identify the accepted repair coating. The material certificate alone says nothing about a later site repair.

Documents carried across the four gates

01

Design-basis revision

02

Accepted sample and option record

03

Inspection and packing release

04

Installation handoff checklist

Request a delivery review

Mark the earliest gate with an unresolved item. Include the responsible party and a date for the record so the next supplier or site review can start with the right revision.

  • Bring country, use, quantity, plan size and storeys.
  • Bring any wind, snow or seismic figure you already hold, with the document name.
  • State whether the interior is shell-only or includes sanitary and lighting.